The Record
A site by site account of what Oreana opened, closed, and handed back. Keep scrolling for the full record.

On land Oreana has closed, the recovery is real enough to survey, document, and defend against any independent review.

01
Every closure is signed off by an outside assessor before we publish it.
02
Restoration runs alongside extraction rather than waiting until a site shuts down.
03
The figures we report trace back to raw field data anyone can request and check.
It begins before the first machine arrives, while the land is still whole.
Through the working life of the site, recovery is logged beside output.
Nothing reaches this page until an outside assessor confirms it.
The cycle closes only when the land is signed back, stable on its own.
